K. Choudhury; C. K. Sarma; P. Barua; B. Baro; P. Bharali; J. Enghipi
(2024)
.
Suitability Classification for Construction of Rainwater Harvesting System by using Geospatial Techniques in Lumbajong and Langsomepi Watersheds of Karbi Anglong District of Assam, India,
Agricultural Mechanization in Asia, Africa and Latin America (AMA),
55(4),
0-0
A. Thakur; S. Barua; S. Mahanta; K. Choudhury; S. Borah; M. Choudhury; B. Neog; K.K. Sharma; R. Yadav
(2023)
.
Trends and Prospects of Female Labor Force Participation Rate in Agricultural Sector of Assam with some selected variables,
Agricultural Mechanization in Asia, Africa and Latin America (AMA),
54(6),
0-0
P P Dabral; Kabyasree Choudhury; Sanjana Debbarma
(2016)
.
Probability analysis of 5-days antecedent rainfall at different return periods and seasons for Doimukh (Itanagar), Arunachal Pradesh,
Indian Journal of Soil Conservation,
44(3),
332-335
, DOI : June, 2016
Choudhury, E.K.()Drip irrigation: Need of the hour in AssamThe Assam Tribune.85(72),1, ,
Choudhury, E.K.()Rain can be the gainThe Assam Tribune.84(333),1, ,
Achievements
Best Presentation award for the technical session "River Corridor Issues and Challenges" for the abstract titled "Use of Hydrologic and Hydraulic Models for Flood Inundation Mapping" at the 4th International Conference on River Corridor Research and Management (RCRM-2024) jointly organized by Indian Institute of Technology, Guwahati and the Indian Institute of Technology, Jammu held from March 7th to 9th, 2024.
Membership
Soil Conservation Society of India
Life Member
Indian Society of Remote Sensing
Life Member
Projects
ASTEC sponsored
project on
"Suitability classification for construction of rainwater harvesting system through application of RS and GIS for efficient water management in Lumbajong and Langsomepi block of Karbi Anglong",
project cost Rs.1 Lakh
implemented in 2020.
ASTEC sponsored
project on
"Suitability classification for construction of rainwater harvesting system through application of RS and GIS for efficient water managemnt in Karbi-Anglong",
project cost Rs.100000 Lakh
implemented in 2020.